[FAR Part § 33.93: Teardown inspection -- FAA FARS, 14 CFR] -- Flightsim Aviation Zone - Number 1 Flight Simulation and Aviation Resource! Information, Tools, Downloads, Databases, FAQ, Aviation Humour, Glossaries, Directory, FS2006, Multimedia, Screenshots, Free Flight Planner, Weather Reports | Aviation Databases - aircraft, airports, airlines, countries, timezones | Flight Simulator X
 
» Support this site -> Shop Online at Amazon!
Friday 21 November 2008 11:45 GMT
 
 

FAA Federal Aviation Regulations (FARS, 14 CFR)

FARs   >   Part 33   >   Section 93 - Teardown inspection

PREVIOUS section 33.92  |  section 33.94 NEXT

FONT
serif sans
TEXT SIZE
T T T T
(a) After completing the endurance testing of §33.87 (b), (c), (d), (e), or (g) of this part, each engine must be completely disassembled, and

(1) Each component having an adjustment setting and a functioning characteristic that can be established independent of installation on the engine must retain each setting and functioning characteristic within the limits that were established and recorded at the beginning of the test; and

(2) Each engine part must conform to the type design and be eligible for incorporation into an engine for continued operation, in accordance with information submitted in compliance with §33.4.

(b) After completing the endurance testing of §33.87(f), each engine must be completely disassembled, and

(1) Each component having an adjustment setting and a functioning characteristic that can be established independent of installation on the engine must retain each setting and functioning characteristic within the limits that were established and recorded at the beginning of the test; and

(2) Each engine may exhibit deterioration in excess of that permitted in paragraph (a)(2) of this section including some engine parts or components that may be unsuitable for further use. The applicant must show by analysis and/or test, as found necessary by the Administrator, that structural integrity of the engine including mounts, cases, bearing supports, shafts, and rotors, is maintained; or

(c) In lieu of compliance with paragraph (b) of this section, each engine for which the 30-second OEI and 2-minute OEI ratings are desired, may be subjected to the endurance testing of §§33.87 (b), (c), (d), or (e) of this part, and followed by the testing of §33.87(f) without intervening disassembly and inspection. However, the engine must comply with paragraph (a) of this section after completing the endurance testing of §33.87(f).

[Doc. No. 26019, 61 FR 31329, June 19, 1996]
PRINTABLE VERSION of this PageE-MAIL THIS PAGE to Somebody!SAVE TO FAVORITES / Bookmark this PageLINK TO THIS PAGE! (view simple HTML code)

Current page:   FARs   >   Part 33   >   Section 93 - Teardown inspection

PREVIOUS section 33.92  |  section 33.94 NEXT

page stats: viewed 493 unique times - last change 25-Jan-2005

SEARCH the FARS :

Top of Page

» DOWNLOADING (PARTS OF) THIS WEBSITE AUTOMATICALLY IS NOT ALLOWED! «

THIS IS NO OFFICIAL SOURCE -- [DISCLAIMER] [FAA WEBSITE]

See also: AIM | ATC | FSS | NOTAMS | PCG |

 
Top of page
add to favorites @ E-mail this! Link to this!
Top of page
© 2002-2008 - Legal | Contact | Advertise | Sitemap
Visit our $pons0rs:
Ladbrokes Bingo | Your site here?
hosted by 123XS || also visit: Flightsim Search & Aviation Search || Link to us!